Full preparations of the construction waste crusher before starting

by Xinhongji Refractory Xinhongji Refractory Materials
The main shaft is an extreme vital part of the construction waste crusher, it must have sufficient strength and rigidity to ensure a normal operation of the crusher. The foregoing fracture accidents of the shaft told us that they mostly occur in the upper Gewindefreistiche, the lower part matching with the cone and the interface of two different diameters. The factor that caused the fracture is due to the crushing of oversized ores at the discharge opening and too fast discharging. The products granular property accounts a lot in crushers operation, model selection or the next manufacturing and processing as well as flow design and calculation. Elements influencing the granular property: materials property, fines content during feeding, the type of a crusher and operation etc. Similar granular property of the construction waste crusher products, it can be selected according to the grain size characteristic curves in the instructions of the construction waste crusher. Therefore, for a better operation of the crusher, Shanghai SBM Mining Machinery will describe the preparations for you before starting. 1. Examining carefully that whether each part is in good condition, all the connectors are tight and obstacles exist in the conveying part. 2. Checking that whether there’s stone or iron ore in the crushing chamber. The foreign substance like ores must be cleared away to make sure that the crusher get started in a non-load condition. 3. Checking the auxiliary equipment’s such as the feeder, belt conveyer, electric equipment and the signal device that whether they are in good condition. 4. Examining that whether the size of the discharge opening complies with the production process requirement. 5. Examining the oil level and oil temperature in the tank, using heating equipment to heat the oil up to 20 degree when the temperature is pretty low due to cold winter. 6. Checking the lubrication equipment and the interlocks condition of the oil pump motor and the crusher motor. After finished the foregoing inspection and making sure that everything is well-conditioned, then the crusher can be started via the starting procedure.

Sponsor Ads


About Xinhongji Refractory Advanced   Xinhongji Refractory Materials

27 connections, 0 recommendations, 124 honor points.
Joined APSense since, November 17th, 2014, From Zhengzhou, China.

Created on Mar 22nd 2018 01:30. Viewed 488 times.

Comments

No comment, be the first to comment.
Please sign in before you comment.