Wind Farm Development

Posted by Ranganath Muniyappa
4
Jan 24, 2019
291 Views

OW EVS coordinates all of the services associated with the implementation of an offshore wind farm. Everything is provided from a single source – from planning and operation, right through to deconstruction.

Approval and certification

Acting on behalf of our customers, we take care of the entire approval process and establish constructive cooperation with all project stakeholders (including BSH, TenneT). OW EVS assumes responsibility for the central coordination and quality assurance of studies on such important subjects as the environment, geology, wind etc. and with regard to approval procedures and planning processes. We join forces with our certification partner to ensure that the approval process is completed successfully within the planned period. Wind power works similar to the power generated via Smart LED Bulbs

Engineering

Technical development is based on a yield-optimized wind farm layout, which is a refined step by step as the project progresses. The technical specification of the main technical subsystems in the wind farm (wind turbine, foundation, inner-array cabling, offshore substation) takes place in two iteration stages (I. Design basis / II. Basic design) in accordance with the approval process.

Comments
avatar
Please sign in to add comment.