How To Install Carpet Properly
Carpet
laying in the home is the important part of the decoration, the installation
must be meticulous, in order to lay out a comfortable and easy to use and
beautiful carpet. General laying carpet operation procedures are as follows:
1.
Primary treatment:
The sub
material under carpet laying is generally cement floor, wood flooring or other
materials. That requires surface smooth, smooth, clean, if oil, to be rubbed
with acetone or turpentine. Such as cement floor, should have a certain
strength, moisture content of not more than 8%, surface roughness deviation of
not more than 4mm.
2.
Elastic line, sets of square, sub-grid, positioning:
To
strictly in accordance with the design drawings of various parts of the
specific requirements of the room and the bomb line, set square, sub-grid, such
as the drawings are provided for and required that the construction in strict
accordance with the map. If the drawings are not specific requirements, should
be said to find and play the line can be positioned laying.
3.
Carpet tailoring:
Carpet
cutting should be carried out in a relatively wide central and unified. Be sure
to measure the size of the room accurately, and press the room and the carpet
model number one by one. And then according to the room size, shape, cut off
the carpet with the cutting edge material, the length of each carpet than the
room grows about 2cm, the width to cut the carpet edge line size calculation.
Cut off the edge part of the ball line, and then push the cutter from the
blanket back cut, cut into volumes after the volume on the number, into the
room, a large area of the Office of Housing should be cut in the construction
site patchwork.
4. Nail
barbed barbed strips:
Along
the edge of the room or walkway skirting board, with high-strength cement nails
will be spiked nail plate in the grass-roots (nail toward the wall), the
distance of about 40cm or so. The barbed plate shall be 8-10 mm away from the
base of the skirting board to facilitate nailing the barb board.
5.
Laying the liner:
The
liner with point sticky brush 107 glue or polyvinyl acetate latex, stick to the
ground level, to leave the barbed plate about 10mm.
6.
Carpeting:
A.
Stitch the carpet: the carpet will be cut a good shop in the cushion on the
virtual, and then roll up the carpet, the joints in the joints. Suture is
completed, with plastic adhesive tape affixed to the suture, the protection of
seams not be scratched or evoked, and then tile the carpet, with curved needle
in the seams to do down the dense suture.
B.
Position extension and fixed carpet: first a long edge of the blanket fixed to
the barbed plate, the flash cover to the skirting board, carpet stretchers
stretched carpet. Stretch, hand hold the carpet support, with the knee hit the
carpet support, step by step from one side to the other side. If it fails to
flatten it again, it should be stretched until it is leveled. Then fix the
carpet to another barb plate and cover the burrs. Grow the carpet, cut with a
cutting knife. One direction of stretching is completed, and then the other
direction of the stretch until the four sides are fixed on the barbed plate.
C.
Laying the carpet, the first side of the room in the brushing adhesive, the
shop has been pre-cut carpets, and then use carpet support, to both sides of
the pull; and then along the wall brush two adhesives, the carpet flattened
side.
7.
Cleaning:
To pay
attention to the treatment of door pressure and the door frame, walkways and
foyers, ground and tube roots, heating enclosures, box, walkway and bathroom
threshold, stairway and aisle platform, inner door and outer door, carpet
junction and skirting board and other parts Carpet sets of cut and fixed and
cover side work, must be bonded firmly, should not be revealed, after the
repair and other repair work. Carpet laying is completed, fixed to close the
mouth, the application of vacuum cleaners, and the blanket on the blanket
surface, such as complete clean-up clean.