How to Support Miscellaneous Fill by Rock Bolts?

With the increase of urban buildings, the use of miscellaneous
fills as foundations has also increased. Due to the different particle sizes of
miscellaneous fills and large pores, the construction process of a casing with
pipes is generally adopted, but the casing pulls out. Problems such as
shrinkage holes, collapsed holes, and stuck drills after exiting, then, how to
do bolt support with miscellaneous fill?
Difficulties in Supporting Miscellaneous Fill
Complex Composition
Miscellaneous fill is generally made up of materials such as
domestic waste, engineering waste, and construction waste. The composition of
domestic waste is relatively complex. If the soil contains organic waste, it
will be corrosive to a certain extent. Industrial waste may contain some
harmful substances to the human body and the environment. The ingredients need
to be investigated in detail in advance.
Loose Soil
Due to the different materials of the miscellaneous fill, the
size of the particles may be quite different, and the large pores will cause
the soil to be loose, the shear strength is low, and the compressibility is
high. At different locations on the same site, its compressibility and bearing
capacity will be different. If it is used as a foundation, it needs to be
manually treated first.
Submerged in Water
If the miscellaneous fill contains humus or hydrophilic and
water-soluble substances, it will cause the foundation to settle and be
submerged in water. Industrial residues may contain hydrates, which tend to
disintegrate or swell when exposed to water, and the strength of the fill will
decrease rapidly. It is necessary to investigate the technical possibility of
soil treatment and the economic rationality of its utilization.
The Mixed Fill Bolt Support Method
Construction Process
Positioning and layout - foundation pit excavation - ground
leveling - anchor rod and accessories material preparation - drilling rig in
place - connecting rod body and drill bit - connecting rotary grouting adapter
- air/water flushing drilling - drilling synchronous grouting - extending
anchor Rods - Repeated drilling and grouting - Installation of waist beams -
Excavation of the next layer
Process Comparison
Under normal circumstances, the construction process of pipe
casing is used for geology that is not easy to form holes. This construction
process requires a lot of labor costs and is prone to collapse or hole
displacement. The follow-pipe casing may face a long construction period for a
single piece, which will lead to project delays, require more grouting pipes,
exhaust pipes, and casing extraction equipment, high labor costs, and pipe
breakage may occur during the extraction process. The overall cost is higher.
Construction Efficiency
The construction efficiency of a self-drilling hollow grouting
anchor rod for miscellaneous fill is at least 3 times that of the pipe casing.
The slurry can be immersed into the rock and soil mass to play the role of
bonding, and finally, form a complete anchor body to improve the bearing
capacity of the rock mass. The self-drilling hollow bolt does not need to be
pulled out after drilling and has little disturbance to the stratum, low labor
cost, and low comprehensive cost.
Ordinary rock bolts will encounter many difficulties in the
construction of miscellaneous soil, and self-drilling hollow bolts can solve
these problems well. If you’re interested, please do not hesitate to contact us
at sinorock@sinorockco.com, we’ll respond to you asap.