300TPH Impact Crushing Plant in Malaysia

Posted by Mongolia Inner
1
Jun 7, 2016
100 Views

Simply put a stone at stone works. Let the stones fall in the natural course of the collision and after the impeller accelerated thrown out of stones, so as to achieve the purpose of crushing! And with natural stones falling stones thrown by accelerated collision time and the formation of a vortex, the return process has performed twice broken, so that during operation of the machine counterattack plate wear is very small!

300TPH Impact Crushing Plant in Malaysia

Routine Maintenance
1. Open a regular stop internal vertical crusher crusher wear observation door observation, the center feed tube, cone cap on the impeller, obscene Road liner circumference shield, wear block wear degree of wear and tear should be replaced or repair, replacement should also replace wearable pieces, wearable pieces to ensure that the same weight. Crusher observed during open door, to observe the inner workings is prohibited, to avoid danger. Found impeller body wear timely replacement patches to find the manufacturer.

2. Vertical crusher Mobil car grease grade or # 3 Lithium Grease, every 400 hours plus the amount of grease, work 2000 hours to open the bearing spindle assembly, cleaning, general work 7200 hours, replaced with new bearings. The upper end of the spindle assembly bearing for the swimming side, the bottom bearing the fixed end, pulled by hand after assembly pulley should be flexible rotation.

More information can be found at:

sbekaolincrusher.com

copperorecrushermachine.com

Comments
avatar
Please sign in to add comment.