After deciding to build a swimming pool on your property, the first question you probably have is, “how long will it take to build?” You are probably eager to hop in the water and start relaxing in your own little oasis. However, there are a few different factors that will determine how long it will take for the pool builders in Atlanta to finish constructing your pool. Keep reading to learn more about these factors and to get an estimate of how long you will have to wait before diving in.

Permitting

Construction cannot begin until you have the proper permits in place. The permitting process is different in every area. This is where having a great pool builder can be helpful since they are knowledgeable about local rules in your area. They will be able to give you a more accurate time period based on the permitting procedures where you live.

Weather

One of the biggest factors that will determine how long the project will take is the weather. Unfortunately, construction and rain just don’t mix. Additionally, the temperature fluctuations that are common in the early spring and late fall can also extend the length of a project. When your builder gives you an approximation of how long the project will take, they will consider the weather in your area. 

The Construction Site

Naturally, projects that involve more work will take longer to complete. This means considering the needs of the site. If the worksite is difficult to access, the land needs to be leveled, there are tree roots growing in the way, or other problems, the project will take longer to complete.

Design

Lastly, the design of the swimming pool will play a part in how long it will take to construct. This means thinking about the size, shape, and special features of the pool, along with the materials used to build it. Custom features like attached spas, fountains, detailed tile work, and others will add on time to the project.  

So How Long Will It Take?

Unfortunately, there is no easy answer to this question. It depends entirely on the specifics of your project. Construction of your pool may take anywhere from 14 days to 60 days or more. To get an accurate estimate of how long the project will take you will need to talk to your pool builders in AtlantaThey have the experience and knowledge needed to give you a precise timeframe for the completion of the project. 


Sponsor Ads


About Kevin Smith Senior   Author

141 connections, 0 recommendations, 692 honor points.
Joined APSense since, December 7th, 2016, From Utah, United States.

Created on Apr 23rd 2019 01:21. Viewed 244 times.

Comments

No comment, be the first to comment.
Please sign in before you comment.