Articles

Data Center Construction Market Trends 2023 | Industry Growth, Share, Size, Demand and Future 2028

by Zayn Mathew Market Research Reports

According to IMARC Group’s latest report, titled “Data Center Construction Market Trends: Industry Share, Size, Growth, Opportunity and Forecast 2023-2028” the global data center construction market to exhibit moderate growth during the next five years.

Datacenter stands for designated archives that offer a physical or virtual infrastructure to store, process, organize, and disseminate data and critical files of an organization. They are distinctly designed distinctly and can be either internet-facing or enterprise data centers. The data centers comprise of the most significant network systems for performing daily tasks efficiently. They also constitute a large-centralized place with multiple IT systems and solutions or a small room with physical files and reports.

Request for a free sample copy of this report: https://www.imarcgroup.com/data-center-construction-market/requestsample

Market Trends

The rising adoption of data center servers across numerous industries for consistent data transfer from private servers to cloud-based solutions is currently driving the market growth. Data centers primarily store servers and other equipment, thereby enabling cloud service providers to house various cloud services and resources. Additionally, the extensive use of private and public cloud solutions is expected to grow in the coming years, which will propel the global market for data center construction. Moreover, the data transferring has significantly boosted across public cloud and other commercial facilities, such as network provider’s point of the current location and colocation sites. This has catalyzed the adoption of the Internet of Things (IoT), which utilizes data center servers to include endpoint devices, nearby devices, and intelligent gateway devices. In the coming years, the rising client-centric solutions, sophisticated security management, and numerous technological innovations will continue to drive the global market for data center construction.

Data Center Construction Market 2023-2028 Analysis and Segmentation:

Competitive Landscape:

The competitive landscape of the market has been studied in the report with the detailed profiles of the key players operating in the market.

Some of these key players include:

  • AECOM
  • DPR construction Inc.
  • Eaton Corporation Inc.
  • Fujitsu Limited
  • Holder Construction Company
  • Legrand SA
  • Rittal GmbH & Co. KG
  • Schneider Electric SE
  • Tripp Lite
  • Turner Construction
  • Vertiv Group Corporation.

The report has segmented the market on the basis of construction type, data center tier standards, vertical and region.

Breakup by Construction Type:

  • Electrical Construction
    • UPS
    • Rack PDU (Power Distribution Unit)
    • Generators
    • Transfer Switches and Switchgears
    • Others
  • Mechanical Construction
    • Cooling Systems
    • Racks
    • Others

Breakup by Data Center Type:

  • Mid-Size Data Centers
  • Enterprise Data Centers
  • Large Data Centers

Breakup by Tier Standards:

  • Tier I & II
  • Tier III
  • Tier IV

Breakup by Vertical:

  • Public Sector
  • Oil & Energy
  • Media & Entertainment
  • IT & Telecommunication
  • Banking, Financial Services and Insurance (BFSI)
  • Healthcare
  • Retail
  • Others

Explore full report with table of contents: https://www.imarcgroup.com/web-hosting-services-market

Breakup by Region:

  • North America
  • Asia Pacific
  • Europe
  • Latin America
  • Middle East and Africa

Browse Related Report:

Digital Media Adaptor Market

Conditional Access System Market

Containerized Data Center Market

Ota Transmission Platform Market

Clickstream Analytics Market

Live Chat Software Market

Embedded Computer Market

In-App Advertising Market

About Us

IMARC Group is a leading market research company that offers management strategy and market research worldwide. We partner with clients in all sectors and regions to identify their highest-value opportunities, address their most critical challenges, and transform their businesses.

IMARC Group’s information products include major market, scientific, economic and technological developments for business leaders in pharmaceutical, industrial, and high technology organizations. Market forecasts and industry analysis for biotechnology, advanced materials, pharmaceuticals, food and beverage, travel and tourism, nanotechnology and novel processing methods are at the top of the company’s expertise.


Contact US

IMARC Group

134 N 4th St. Brooklyn, NY 11249, USA

USA: +1-631-791-1145 | Asia: +91-120-433-0800

Email: sales@imarcgroup.com 

Follow us on Twitter: @imarcglobal

LinkedIn: https://www.linkedin.com/company/imarc-group/mycompany/


Sponsor Ads


About Zayn Mathew Advanced   Market Research Reports

81 connections, 0 recommendations, 349 honor points.
Joined APSense since, February 20th, 2018, From Brooklyn, United States.

Created on Apr 8th 2021 05:44. Viewed 355 times.

Comments

No comment, be the first to comment.
Please sign in before you comment.