Best Guidelines For Bathroom Renovators

by Jhon Harry Digital Marketing

The bathroom is one of the smallest rooms in the house and one of the most expensive rooms to renovate. Bathroom renovation is a task that, if done well, can add value to a home and a large space full of design and lighting.

Bathroom Design

Bathroom design is the first area where your bathroom is renovated to be properly arranged. Simply replacing an existing bathroom renovators with a single design may not be enough. The key to a luxurious bathroom design is to design it with the people who will consider it. However, make sure your bathroom design also has a common usage factor. For example: If you are designing a family bathroom, you can still design a bathroom with easy access to the bathroom and shower. This ensures that the design will work for people with reduced mobility. This means that if you decide to sell your house or renovate for a profit, your design is more attractive on the market. Great bathroom design also makes good use of space, keeping in mind the location of the light or window, the size of the fixtures and the hygiene options. Make a plan to expand the size and bottom of the room. Identify existing drain points and then water inlet points. List all types of bathroom accessories and desires in all sizes. Now get the two together and see what works. Note: Most sewerage points and water inlets can be relocated, but at an additional cost.

Bathroom Reconstruction

If you decide to do all or part of the task yourself, it's time to skip the box and pull out the old bathroom renovators. If your house was built before 1980, you probably have asbestos fiber wall and it will require a lot of care. You will need a completely unique shape, eye protection and high quality dust masks. Contact your local authority or building council for rules on removing asbestos lining in the bathroom.

Remove everything except plumbing. If you keep plumbing in the bathroom renovators, you won't have to turn off the water for the entire house. You will also need to install a floor tile hammer, sand bed and paving cement in it.

Bathroom Renovation And Construction

The bathroom should be ready for construction from A to Z to make sure the finish is correct and correct. It also ensures that the design and appearance of the bathroom renovators will look great

Bathroom Renovation Process

·         Installation of water and sewerage pipes and wiring.

·         Install the wall and ceiling lining and then install the bathroom and bathroom stove.

·         Floor water, bathroom and bathroom vacations.

·         Secure the floor fall with sand and cement ready for the floor.

·         Laying floor and wall tiles followed by plaster.

·         Install a new bathroom item, accessories and faucets - install a new electric one.

·         Roofing and ultra clean.

The first step is plumbing and electricity

At this point, all new plumbing is installed to clean hot and cold water and sewage. When installing new pipes, care must be taken to ensure that the plumbing fixtures are correct when fixing the tiles. For example: To center the fixtures in the shower area, you need to take into account the thickness of the wall panel and glue the tiles and tiles so that the installation is centered after the tiles are installed. The same applies to installing toilet sewer pipes, wall linings and tile thickness must be taken into account so that the pipe is in the correct position when installing the toilet after tiling. Harder for all new power cables without plugging in.

The Second Step Is To Strengthen The Wall And Roof Linings

Carefully install a 6mm wall lining to secure the fiber boards without passing them on new electrical wires and pipes. The best way is to measure and mark the piping and wiring arrangement on the new wall board with a pencil on the go. The most common is screw (or nail) roof linings, plasterboard. However, if you are laying tiles from floor to ceiling, do not install the eaves, as it is better to do this after tiling. If you are not on the roof, install a cornice after installing the wall panel and lining. Even if the bathroom renovators is not freestanding, you can now configure the frame and install the bathroom. Make sure the bathroom is properly installed by allowing thick tiles and glue to be applied. Be sure to check all covers and pipes before proceeding with the bathroom renovation process.

The Third Step - Waterproofing Your Bathroom

Watertight around your bathroom floor, holiday shower and bathroom renovators. When waterproofing the ground, make sure that the waterproofing material is 100 mm above the walls. You will need a shower barrier that is insulated 100 mm above the shower rose outlet. 100mm should be waterproof around the bathroom and above the floor bath lip. Install a 25 x 25 mm aluminum angle with silicon and water quality at the entrance to the flange.

 


Sponsor Ads


About Jhon Harry Advanced   Digital Marketing

41 connections, 2 recommendations, 240 honor points.
Joined APSense since, September 18th, 2018, From New York, United States.

Created on Mar 6th 2020 00:03. Viewed 281 times.

Comments

No comment, be the first to comment.
Please sign in before you comment.