Articles

certification of a manufacturer's quality system

by yixuejiaren
Documentation of the reasonable testing program and how it was implemented. Comments: Most comments addressed the five elements tiffany bracelets on sale of the reasonable testing program, either by suggesting that the Commission allow for some flexibility as to what constitutes a reasonable testing program or by suggesting specific exceptions or tests as part of a reasonable testing program.Several comments expressed concern that many manufacturers may not be able to specify their products down to the component or raw material level because proprietary information from offshore manufacturers may prevent importers from knowing every component of the products they purchase. One comment noted that importers typically do not control the production process of the products they import, so the Commission should define a reasonable testing program differently to address an importer's special circumstances.

tiffany Pendants on sale Another comment suggested that "reasonable" for some products would involve less than the five elements outlined by CPSC in the notice for a reasonable testing program. For example, because some regulations require placement of a label, the comment said that "testing" in that circumstance would consist of observing that the label was placed properly.One comment stated that any testing program that results in an acceptable confidence level that a product complies with the applicable standards should be considered an acceptable reasonable testing program. The comment also suggested that other items, such as factory certification (to recognized standards), audits, risk assessment plans, certification of a manufacturer's quality system, etc., should be allowed as elements of a reasonable testing plan.

One comment suggested allowing process capability testing, where, for a continuous-flow process, first-run samples are tested, as a form of certification testing. The comment urged the Commission to allow a manufacturer to search "backwards" and "forwards" in continuous-flow process for good product in the event that a test during manufacturing shows noncompliance.Several tiffany earrings on sale comments noted that, for seasonal or short-run products, only prototype samples may exist before production begins. Some comments stated that neither the same materials nor the same manufacturing processes were used to manufacture the prototype samples as would be used to manufacture the consumer product.

Sponsor Ads


About yixuejiaren Junior   

0 connections, 0 recommendations, 8 honor points.
Joined APSense since, May 2nd, 2010, From nanjing, Aruba.

Created on Dec 31st 1969 18:00. Viewed 0 times.

Comments

No comment, be the first to comment.
Please sign in before you comment.