ship main engine overhaul
by RA Power Solutions RA power solution
- All the cylinder heads were fully reconditioned and inspected.
- Piston and piston rings were calibrated.
- Due to wear and tear of liners, exceeding the last limits specified in the manual, all the liners were replaced with new ones.
- Crankpin bearings crossed the specified hours of operation and were replaced.
- Inspection and cleaning of all the pumps and sub-assemblies was undertaken.
Review on ship main engine overhaul
After Wartsila diesel engine repair and overhaul, the engine was put on trial and operation. The diesel engine Crankpin grinding, repair and overhaul job was completed in a record time of eighteen days which was appreciated by the client.We have been undertaking ship auxiliary engine overhaul and Main engine repair services for the last forty years. The main and auxiliary engines on which we work regularly include the following:-
WARTSILA-SULZER (Z40, ZA 4OS, A25, A20)
WARTSILA
MAN
MAN B&W
PIELSTICK
Mak
YANMAR
DAIHATSU
BERGEN
Other engines of any type
For more information related to ship auxiliary and main engine overhauling services, contact us on info@rapowersolutions.com or call us at +91-9582647131
Content Source:
https://engineoverhaulingservices.com/blog.php?blogname=Ship-Auxiliary-and-Main-Engine-Overhauling-Services
Related to ship main engine overhaul
Sponsor Ads
Created on Jul 7th 2021 02:05. Viewed 294 times.
Comments
No comment, be the first to comment.