What are the Guidelines to Install a Tower in buildings?
Mobile phone providers
frequently set up their towers in apartment buildings. They are good locations
for installing mobile towers because each structure is many floors high. Before
installation, several laws, guidelines, and privacy must be considered in
India. We'll examine the points to keep in mind before placing a mobile tower
in this blog.
Tower Location
The first thing to keep in mind
is that installing towers in residential areas is NOT restricted. However, if
there aren't any other ideal locations, a tower can be set up in a suburb.
Also, it's necessary to keep in mind that if a tower must be located in a
residential area, it should only be placed on top of buildings. Even then,
public buildings or open places should be the priority for installation. A
tower should only be put on the roof of a building that is only for residential
use after all other possible alternatives have been reviewed.
The best locations to deploy
mobile towers are in forests or outdoor areas. In some of these situations, it
is best to barricade that off area around the tower to try and ensure that both
people and animals cannot come within the surrounding borders.
Verification
Mobile
Tower Installation Services, which is essential, cannot be
executed without the proper documentation and following of protocols. Only with
the knowledge and approval of the ruling authority should a mobile tower be
placed. All mobile authority towers must respect the right procedure before
installation.
Any of the following officers,
such as commissioners of municipal corporations, city municipal council
commissioners, chief officers of town municipal councils, town panchayats, and
panchayat development officers of gram panchayats located in urban development
authority areas, can serve as a sanctioning authority.
It's important to understand
the exact details of a mobile tower when making preparations for the documents,
along with Ground Based Towers, Roof Top Towers, Roof Top Poles, Cell Phone
Towers, Antenna Fixtures, Fabricated Antenna, and Tower Install Telephone
Lines.
The list of documentation that
must be filed to get permission for the installation when you Apply
For Mobile Tower is as follows:
• A location plan that includes
commercial areas. Tower development is restricted next to hospitals and
schools.
• A floor plan that specifies
all of the plot's measurements, the number and height of structures, and plot
access.
• A certificate of structural
stability specifying the tower altitudes and certified by a licensed structural
engineer The mobile tower's weight should not be too much for the structure.
• A copy of the building's established
floor plan and an authorized use certificate.
• Ownership records.
• A lease agreement proving
that the installation has been approved by the applicant and the building
owner.
• A tower layout with the
organization’s specifications and layout guidelines.
• The tower's height and level
information.
• If there is an authorized
forum either high- or low-tension electrical wire, it is required that the
distance between the tower and the lines be reported.
• The measurement capacity of
the tower.
• An assurance contract that
guarantees to bear responsibility for mishaps brought on by this installation
and to provide the necessary reimbursement if needed.
• A fire department notice of
no objection.
• Copies of all the documents
required to demonstrate compliance with the 1986 Environment (Protection) Act.
• A copy of the clearance from
the Standing Advisory Committee on Radio Frequency Allocations, accompanied by
an undertaking that, in the event of complications, disciplinary action will be
performed or the tower will be dismantled.
• Acknowledgement memos from
TERM cells or any other such authority confirming that the radiofrequency
radiation levels in all local public locations are safe.
Sanction Document
Within 30 days, the Tower installation
authorization should be approved. In two years, development is to be completed.
If the project isn't completed, the registration may be renewed if the request
is received before the original permit lapses and is accompanied by payment.
They must be declared in the gazette notification three months after mobile
tower installation. The failure to take this action will end in the tower being
demolished.
Post Your Ad Here
Comments (1)
Marketing Consultant...15
Business Growth Consultant
Dear APSense member, share a connection request with me.