Top 5 Issues with Data Centre Power Generation and Power Management

Posted by Roniey Brown
1
Jun 11, 2016
337 Views
Image

The digital world is growing at a tremendous rate and so are the issues associated with the power generation and management of the data centers. The biggest issue of concern is not the rate of energy usage in the data centre design and build, but the methodology of the power generation and distribution. Moreover the loss incurred over the power before it even reaches to the destination is also a huge concern when it comes to maintain the environmental balance intact. In this article we will give an insight on top 5 issues which are generated by data centre power management.

Variant Issues with Data Centre Power Management System

There are many issues which plague the efficiency of a data centre power management system and in many situations even lead to downtime issues of the entire system. The top 5 issues are listed below:

Efficiency Loss During Transmission- Since the energy is transformed numerous times in the process of its transmission and distribution to the data centre, each transformation is bound to create some efficiency issues.

Choosing between AC and DC- The decision of choosing the power transmission mode within the data centre (whether it should be done via AC or DC) is a matter of concern until today. Whilst earlier the architects considered DC better, with the increase in the equipments and wiring solely for DC, they shifted their choice to AC.

Transmission Losses- The transmission loss is directly proportional to the transmission link between the destined centre and the power infrastructure. The shorter is the distance transmission link, less will be the transmission loss generated.

Poor Designing of Data Centre Construction- One of the major issues with the centre is its poor design and build. In case the server density in the data centre has been increased and adequate amount of space is not available, number of issues such as cooling, ventilation, etc. will arise. Therefore only an efficient data centre design company can design proper data centers.

Hardware Failure- Hardware failure is one of the primary reasons for issues in power generation. Poor quality IT equipments like servers, networking equipment, cabling and racks are likely to wear out if their temperature sores too high, above the prescribed limit.

Wrapping Up- The a fore-mentioned issues when occur in date centers’ power management and generation system, the efficiency of the data centre and the power supplied to it is bound to decrease. Deploying an experienced data centre construction company service like Mercury Power ensures that all the a fore-mentioned issues will be taken care of with the help of trained professionals.