Things To Know About Floor Preparation Ahead of Laying Vinyl Flooring

Posted by Perth Carpet Master
4
Oct 13, 2022
405 Views

Preparation of floor plays a crucial part when it comes to laying vinyl flooring. Here are the steps that one must follow ahead of laying flooring.





There are three types of vinyl flooring to choose from: vinyl planks or tiles, luxury vinyl planks, and vinyl sheets. Each choice has distinct qualities and a distinct installation technique. This prior post contains further information about the many varieties of vinyl flooring. Before laying your vinyl flooring, whether the subfloor of your work area is hardwood or concrete, make sure it is level and clean. However, putting vinyl flooring on concrete necessitates a little more planning. You can get help from a floor preparation expert in Perth to help you with floor laying and later vinyl carpet laying. Here are the steps you should follow through:


Repair Any Cracks or Holes:


Examine the floor and repair any cracks, pits, holes, or uneven sections. To fix the damage, use concrete filler or a similar floor patching material. If the subfloors have big cracks, the best solution is to remove the entire slab and replace it with a new one. Bear in mind that new concrete floors must cure for at least 60 days before installing vinyl planks over them. A floor preparation expert in Perth will do the job meticulously.


Imperfections In the Grind:


In addition, the surface must be as smooth and flat as possible. A floor preparation expert in Perth will sand down any uneven parts, such as humps, lumps, or bulges, with sandpaper or an electric sander with a grit of 40 or 60. After that, grab a moist rag and wipe away any leftover dust.


Clean The Floor:


Using water and a home detergent or degreaser, thoroughly clean the concrete floor. Before you leave the floor to dry completely, it should be free of oily areas and built-up grime.


Perform A Moisture Test:


Before installing vinyl flooring, an expert in floor preparation in Perth will conduct a moisture test, the moisture levels in concrete subfloors should be as low as feasible. Here's a quick outline of how it may look:

- Tape a little scrap of vinyl to your subfloor.

- To prevent air from escaping, ensuring that the edges are properly sealed.

- Leave the tape for three days. After three days, try removing the tape from the floor. If it comes off too quickly, the moisture level may be too high for vinyl application. The room should be dehumidified in this scenario.

 

Use The Underlayment:


An underlayment can provide an additional vapour barrier above your flooring as well as additional cushioning, making the surface feel softer to walk on.


These are the steps that will be taken by a flooring expert in Perth to get your floor prepared for the vinyl floor to be laid. These steps are mandatory ahead of vinyl floor laying. When these steps are not followed, the vinyl floor will not stick to the floor properly.


Comments
avatar
Please sign in to add comment.