Impact of Prefabrication on Project Schedules and Cost Performance
by EPACK Prefab Best-Prefabricated Structure Manufacturer in IndiaAmong the many metrics of
performance in the construction industry, streamlined project schedules and cost
efficiency are the most important. Guaranteeing proven productivity gains
across the entire spectrum of building construction, prefabrication offers a
set of lucrative features unrivalled in their impact on project efficiency,
quality and affordability.
Predicted to redefine the
construction industry, prefabrication focuses on off-site building development in
order to enable a standardized industrial production of structural components
for swift assembly at the site.
The unparalleled positives
of prefabrication on project schedules and cost performance make industrialized
construction the forefront innovation in the sector.
The power of prefab in boosting construction
productivity and affordability
Accoladed to be the
changing face of infrastructure development, prefabrication technology delivers
an advancement which will significantly minimise construction times and costs. Since
many years, the construction industry has fallen short in its performance and
efficiency results as the sector has surprisingly been slow in adoption of
automation and modern manufacturing implementation.
Prefabrication of
enclosures such as portable container office cabins delivers
considerable efficiency gains and up to 50% faster development when compared to
conventional alternatives.
The accelerated
construction timeframes deliver proportional cost saving benefits and there is
better assurance of quality consistency to be observed on a large scale. This
also minimizes maintenance and repair costs.
Project schedule enhancement
with prefab construction
Prefabrication not only
impacts construction project schedules but enables profitability as a result.
The benefits arising from the impact deliver a substantial boost to overall cost
savings as well.
On average there is about
5-7% of schedule compression enabled by implementation of prefab methods. The
higher possibilities of quality control from development of prefab portable office
container enclosures enables shorter project schedules.
With majority of
construction occurring within the confines of an off-site factory environment,
weather delays can be alleviated and this sets the stage for an enhanced return
on investment as well as mitigated market risks.
Prefabrication makes great
strides in shortening design and planning times with better use of cutting-edge
Building Information Modelling technology. There is also a streamlined connect
between the various manufacturing teams which enables on-the-go amelioration of
scheduling tasks whenever required.
Prefabrication impact on project
budget performance
Accelerated construction
schedules deliver better scopes of cost savings in construction. A consistent
and considerable level of cost savings from a renewed building development strategy
deserves all the attention.
With an optimum execution,
prefabrication processes significantly shrink the timelines on
infra-development schedules. As a result, labour costs condense and a swift
shift to newer projects can be targeted.
A streamlined and
standardized design approach from prefabrication mitigates the need of repair
and redesigning saving money as a result.
Prefabrication
construction methods involve balanced dependency on manual labour and machine
use. When compared to traditional methods, prefab technology reduces labour
activity by about 45%.
The full-life costs of a
prefabricated portable container office or any type of a building are
significantly trimmed. Enhanced precision reduces maintenance requisites and
use of sustainable materials brings down energy bills by up to 25%.
To acknowledge the full
potential of prefabrication and its impact on project schedules and cost
performance, get in touch with EPACK Prefab, the leading prefabricated buildings manufacturer in
India.