Consider Important Factors before you Buy Dog Long Lead Leash
A leash is one of the
first purchases every dog-owner makes. Dogs being outdoor and social animals
need to be walked outside on a regular basis. Therefore, a reliable, dog-friendly leash made of superior material is
essential.
Material
The long lead leash is usually made of a soft yet durable, itch-free,
washable material. Since dogs naturally tend to be playful and free, the
material must not feel restricted to the dogs. The leash must not get stuck
into branches while walking the dogs. A weather-proof material is an additional
benefit. Polyester and nylon are widely used for manufacturing dog leashes.
Security
features
The leash must have a
secure connection with the collar; otherwise, the dog may get loose. The leash
must allow control to a good extent. Some leashes have a double lock feature
which is desirable. The carabiner must have 360˚ to allow free movement to the dog. An
easy lock-unlock feature is helpful.
Tension
Force Resistance
This feature
determines the strength of a long lead leash. If tension force resistance is
less than the weight of the dog, it means the leash might break. For bigger and
heavier dogs, it is important to check how much weight a leash can bear without
breaking.
Miscellaneous
features
A soft and strong
grip handle is useful for the person walking the dog. There may also be a slot
to hold the poop bags. Some leashes are made of reflective material to allow them
to be seen at night. Color and design are important factors for some
dog-owners.
A suitable long lead leash is important for
behavioral training and other activities for the dogs. It is important to pick
a suitable leash based on the dog breed, size, and personal preferences
considering the fore-mentioned factors.
Post Your Ad Here
Comments