Are Cracks in Your Home Asking For Your Attention?
by Manya Verma Health care and lifestyleWhile most of us find wall cracks disturbing, they are actually
very dangerous and identify serious structural threats. The buildings that are
constructed recently are more prone to cracks because of the regular settling
and drying of the structure throughout the first year. Cracks appear on the construction
materials like sheetrock, concrete, bricks, tile and stucco.
There are various reasons that cause cracks in the construction.
One of the major reasons of cracks is fluctuation in temperature and moisture
that results in frequent contraction and expansion of the building. While materials
like concrete, mortar, grout and stucco go through a lot of changes after construction,
these constructional cracks do not cause any harm to the structure. A frequent
change in the temperature causes expansion and contraction in the building
which eventually causes cracks in the building, says the Construction Chemicals manufacturers in India. This is why architects
recommend for epoxy flooring services
Delhi when using constructing materials like brick, tile or concrete are
used. We normally see cracks on doors and windows as they are joints and acts
helps in releasing stress in the construction.
How Can You Prevent Cracks?
The general precautions that can be taken to prevent cracks are:
· Choosing the right constructional
material is very important to maintain the quality of the building. It is vital
to use right material and of a good quality to avoid any structural damage.
· A balance between the
mortar and concrete should be according to the design of the building.
Attention regarding the presence of silt and other suspended impurities should
be paid to keep the building safe from any damage. It should be kept in mind
that there should not be the presence of excessive water in the mixture.
·
It is inappropriate to
construct the foundation of the building on muddy or loose soil.
·
Each process of the
construction requires a certain amount of time. The construction should be
processed according to the set routine.