Planning a demolition in Sydney? Before you start tearing down walls, it’s crucial to get the proper approval from your local council or a certified private certifier. One of the key steps in this process is gathering the right documents. Here’s a quick guide to what you’ll need when submitting a demolition application in Sydney:
1. Site Plan
A detailed site plan is essential. It should show the layout of the property, including the structure to be demolished, neighbouring properties, boundaries, and existing trees or utilities.
2. Demolition Plan
This outlines how the structure will be safely taken down. It includes methods, equipment to be used, safety measures, and waste disposal strategies. Most demolition companies in Sydney can help prepare this for you.
3. Asbestos Report (if applicable)
If your building was constructed before the 1990s, an asbestos inspection is mandatory. An accredited assessor must inspect and report whether hazardous materials are present.
4. Structural Engineer’s Report (if required)
In cases where buildings are close to other structures, a structural engineer’s report might be needed to ensure safe demolition.
5. Certificate of Title and Owner’s Consent
Proof that you own the property or have the owner’s written consent is also required for the application.
6. DA or CDC Application
Depending on your situation, you’ll need either a Development Application (DA) or a Complying Development Certificate (CDC). Your chosen contractor (especially if you’ve been searching for demolition companies near me) can advise which is suitable.
Getting all your paperwork in order ensures a smoother, faster approval process. When in doubt, consult experts in demolition Sydney to guide you through each step. For further assistance, visit https://anesti.com.au/