70-247 Practice Questions
Test Information:
Total Questions: 216
Test Number: 70-247
Vendor Name: Microsoft
Cert Name: MCP
Test Name: Configuring and Deploying a Private Cloud with System Center 2012
Official Site:http://www.examsboost.com
For More Details: http://www.examsboost.com/test/70-247/Case Study: 1
Contoso, Ltd
Overview
Contoso, Ltd. is a manufacturing company.
Contoso has a main office and six branch offices. The main office is located in Toronto. The branch offices are located in New York, Seattle, Miami, Montreal, Los Angeles, and Vancouver.
Existing Environment
Active Directory Environment
The network contains an Active Directory forest named contoso.com. The forest contains a child domain for each office.
Active Directory currently contains 7,500 user accounts and 15,000 computer accounts.
Network Infrastructure
All servers are located in a data center in Toronto. The data center contains multiple subnets that are separated by firewalls.
The Toronto data center contains a cluster that runs Microsoft SQL Server 2008 Enterprise Service Pack 1 (SP1).
Four servers are unused and are being considered as potential Hyper-V hosts. The servers are configured as shown in the following table.
All of the servers being considered as potential Hyper-V hosts have both locally attached storage and access to a SAN.
Help Desk Environment
Contoso uses a help desk ticketing system that was developed in-house. Fifty help desk agents have access to the ticketing system.
The ticketing system currently tracks:
·An average of two new incidents per month, per client computer
·An average of 2,000 change requests per month
Disaster Recovery Environment
Contoso uses a third-party backup solution. Backups are scheduled for the servers in the Seattle office as follows:
·The daily incremental backups total 10 GB.
·The total size of data to back up is 100 GB.
·Backed up data is retained for 10 business days.
Problem Statements
The original developers of the help desk ticketing system are no longer employed by Contoso and maintenance of the system is becoming an issue.
Requirements
Planned Changes
Contoso plans to move the IT infrastructure to a private cloud.
Whenever possible, hardware and software costs must be minimized.
Contoso plans to open a small office in Beijing. System Center 2012 App Controller will be used to manage applications. The display names of the applications will be in Simplified Chinese Pinyin IME.
New physical servers will be deployed by using System Center 2012 Configuration Manager from a server named Server5. Server5 will also be a PXE service point.
The current backup solution will be replaced with System Center 2012 Data Protection Manager (DPM).
A public key infrastructure (PKI) will be deployed to issue and manage certificates. The PKI deployment must be made as secure as possible.
Hardware load balancers will be deployed for use in the deployment of private cloud services.
Cloud Requirements
Contoso plans to implement a cloud solution that meets the following requirements:
·Stores all virtual machines on the SAN only.
·
Post Your Ad Here

Comments