VSI new type sand making machine is the most advanced artificial sand production machinery and equipment, the system of sand and machine equipment, whether from the appearance of the structure, the internal principle or the sand production effect are very advanced. Compared with the traditional VSI sand making machine , impact type sand making machine, sand blasting machine equipment, the installation and maintenance methods are not the same, the following our VSI sand making machine manufacturers to introduce the VSI new type of sand machine equipment for the demolition and installation and maintenance.

Sand making machine equipment mainly consists of: the upper cover, the body, the impeller, the bearing cylinder, the drive motor. Understanding of the method of removing the equipment of the VSI system is helpful to the maintenance of the future. We will come to you today to introduce the main components of the system of the main components of the demolition method.

VSI sand making machine cover and remove the hanger center;
Remove the impact crusher cover screw. Start the hydraulic jack to lift the lid of the machine to rotate 90 degrees to the direction of no obstacle. Hanger center is a center feeding tube and the central feeding tube fixing screw loosening, the feeding tube they could be removed. Then the center fixed hanger screw dismantled, hanger center with heavy tools away.

Two, VSI sand machine part of the demolition of the impeller;
Ding Ding, the lower end of the frame in the thickness of the material support if the door to door door impeller mouth ring is fixed with a screw loose unload, impeller mouth ring lift (impeller mouth ring wear serious, should be the timely replacement of the new impeller mouth ring), the impeller chamber cleaning clean, remove the impeller center part of the fixed cone screw (10.9 hexagon screw) to lift the feed cone (if the cone material wear serious, should be timely replacement material cone), a diameter less than the spindle diameter 30mm gasket, placed in the spindle axis of the above, the gasket is arranged above the 50 tons of Mechanical top, and then do a diameter greater than impeller diameter of snag impeller to start 50 tons of mechanical gantry beam of the impeller discharge.

Three, VSI sand bearing cylinder assembly of the demolition;
First master device below motor triangle belt adjustment to the minimum position, remove triangular belt, remove the fixed bearing cylinder and a lower positioning plate between the flange cone fixed screw, with the same screw belt into the thread of the screw hole, a top flange cone. Remove the upper part of the bearing cylinder and positioning disc screw loose connections, with the same screw in with threads of four screw holes the bearing pipe body top lifting the.