PROJECT MANAGEMENT OVERVIEW - ASSIGNMENT N 2 (Value 40%)
PROJECT MANAGEMENT OVERVIEW - ASSIGNMENT N 2
(Value 40%)
PROJECT CHARTER, SCOPE MANAGEMENT, PROJECT PLANNING
Aim of Assignment:
· Create a Project Charter, Requirements Document & Work Break Down Structure
· Apply scope change management processes
· Demonstrate understanding of project planning through the analysis of a
case study
[Note: Topic Notes 4(Initiation),
5 (Project Planning) and 6 (Scope Management) provide the background to
complete this assignment)
PART I (68 marks)
PROJECT
CHARTER, WBS, SCOPE CHANGES
[NOTE:
Part I is a practical assignment. No academic references are required. It is
not as a piece of academic writing. The Charter, Requirements Document and WBS must be written as formal project
documents
Select a project. The project can be:
· One that you are
presently involved in or project happening in the future in which you will be
involved – either business or social project.
· A hypothetical but
relevant project
A.
Produce a PROJECT CHARTER, using
the template herein (38 marks)
·
Problem / Opportunity
Statement (6 marks)
·
Strategic Alignment (6)
·
Benefits (6), KPIs (6)
·
Deliverables (6), High-level
Requirement(s) (6), Exclusions (2)
·
Cost, Timeframe, Risks,
(0) (no marks - just provides experience of completing a full charter)
B.
Produce a REQUIRMENTS TRACEABILITY
MATRIX using the template herein, list 4 requirements
then trace to features in the final deliverables (8 marks)
C.
Create a WORK BREAKDOWN STRUCTURE using the template herein: (list format, not
chart format). (Note: the WBS must contain at least 15 work packages. If you
have a large project, provide the top-level elements, and decompose 1,2 or
3 of these elements so that at least 15
work packages are created (12
marks).
)
D.
Describe a possible SCOPE CHANGE requested by the sponsor. Fully
evaluate the requested change. Produce and explain the revised sections
of WBS, assuming that the change is accepted (10 marks)
PART II (30 marks)
CASE STUDY:
“Goal Definition and Performance Indicators in Soft Projects” (See separate
handout)
(Approximately
500-1200 words in total for Part II)
Part A and B have to be undertaken individually
In answering the case study, make any necessary but
reasonable assumptions. Support any answers wil direct reference to the text in
the case study
1.
What are the (16 marks):
·
Deliverable(s ) (4 marks),
·
benefits (4). And suggest one suitable KPI for one of the benefits (4)
·
strategic alignment (4)
2.
Describe one specific project planning
problem encountered in this project, and how it may have been avoided or
better managed. (8 marks)
(200-300 words)
3.
Describe one specific example of good project planning in the project. (8 marks) (200-300 words)
Dates & Penalties.
Date given /due see
unit outline.
Penalties for late submission see unit outline
Format
The assignment must be typed on A4 paper (using one side
only) in one-and-half typing and presented with a cover sheet setting out your
name, lecturer's name, unit title and the topic of the assignment. Arial
Narrow, 12 font
All papers should be numbered.
All assignments should be thoroughly checked for typing,
spelling and grammatical errors before being submitted.
|
PROJECT CHARTER |
|||||
|
Sponsor: |
|
||||
|
Project Title: |
|
||||
|
Prepared
By: |
|
Date: |
|
||
|
Problem/Opportunity
Statement: |
|||||
|
Key Deliverables:
Key Requirements Exclusions |
|||||
|
BENEFIT |
KPIs |
|
|||
|
|
|
|
|||
|
|
|
|
|||
|
|
|
|
|||
|
Strategic Alignment |
|||||
|
Approximate
Cost |
|||||
|
Approximate Timeframe |
|||||
|
Key Risks |
|||||
|
APPROVAL Yes / No Authority: ______________________________ Date:____________
Sponsor |
|||||
|
REQUIREMENTS TRACEABILITY MATRIX |
|
|
Product Requirement |
Deliverable component |
|
|
|
|
|
|
|
|
|
|
|
|
|
PROJECT |
|
|
WBS # |
WBS – ELEMENT |
|
|
<