Kitchen Remodeling: 8 Common Steps of a Typical Remodeling
Kitchen remodeling is getting popularnowadays but in spite of its
fame, there is one thing that matters a lot; the craftsmanship and the
quality of work put into play by the remodeling contractors. It is
therefore significant that you have a prior understanding of the type of
work that they will be doing on your kitchen before you hand over the
work to them. Ideally, the procedure that the remodeling contractors
performinclude demolition, electric work, framing, plumbing,
installation, dry wall, floor and tile setting among other activities.
What steps are usually followed during a typical kitchen remodeling session?
Step 1: Building plans for the kitchen renovation
Your
kitchen remodeler is required to come up with plans related to the
structural, plumbing, electrical and mechanical styles because there are
different permit requirements for every kitchen. You can make a
confirmation of these elements by requesting outside engineers to review
what your remodeler has done. The main purpose of this step is to
convert the renovation designs of your kitchen into construction
documents. The documents have to be submitted so that the construction
permit can be approved as an issuance of the final approval.
Step 2: Ensuring safety and cleanliness for your kitchen remodeling
Kitchen
remodeling is very hazardous especially if children are present. Some
of the equipment used in remodeling include: wires, nails, and studs
etc. which are lethal. Moreover, there are instances when the work can
get messier and at that time, you have to ensure that you maintain a
very clean environment and build up barriers or “no go zones” that will
prevent children from being injured.
Step 3: Demolition and framing
Before remodeling your kitchen, there are items that must be disconnected like electric, water and gas lines. Modern Kitchen Cabinets Los Angeles,
counter tops and sinkshave to be removed. One critical thing in this
stage is the room squaring which could be very complicated if the
remodeling process is only a small part of the general project. Make
sure that the remodeler is very careful because it is a very fragile
stage.
Step 4: MEP: Mechanical, Electric and Plumbing
At
this point, you will be done with issues that concern permits,
demolition and framing of your kitchen which is always carried out by
the general craftsmen. MEP is usually carried out by the trade
contractors and the task of the designer is to ensure that all workshave
been done according to what you initially agreed on.
Step 5: Bringing building inspectors
Building
inspectors are brought to ensure that everything is carried out in
accordance to the building codes. Close stickers are also issued at this
point so that the job can be continued as planned.
Step 6: The kitchen remodeler’s duty
Your
kitchen remodeler is responsible in this step because he will be
required to insulate, drywall the open walls and make the foundation of
the floor. After that, he will install other kitchen appliances and
cabinets in their right place; which is followed by trimming of the
carpentry items and then painting.
Step 7: Substantial completion
The
plumber will install the faucet and connect all the appliances whereas
the tile setter performs his function of setting the kitchen backlash
tiles. At this point, the electrician will also be required to install
the light fixtures and other device plates.
Step 8: Begin to enjoy your new kitchen
On
completion of the remodeling process, your designer will take you
through the maintenance requirements and guide you on how to install and
use all the appliances.
The rest is up to you, enjoy your new kitchen and ensure that your kitchen is always attractive!
About Author
Kitchen Remodeling Orange County is
getting popularnowadays but in spite of its fame, there is one thing
that matters a lot; the craftsmanship and the quality of work put into
play by the remodeling contractors.