High-Quality Factory Relocation Is The Key To Your Peace Of Mind
In regions with actively developed production, relocation of a plant, factory relocation, or a separate workshop is a common phenomenon. This is a complex and responsible procedure that requires utmost responsibility and competent organization. The head of the enterprise faces a wide range of tasks that require an optimal solution. The multi-stage process of transporting equipment, equipment installation, raw materials, finished products, tools and many ancillary facilities is time-consuming.
The need to relocate production may arise in connection with the reorganization of the enterprise, the receipt of more modern and improved equipment, the expansion of production capacity, and an increase in the volume of products. Often, the managers of factories and plants have to face the difficult task of moving a workshop or an entire plant to another city.
Depending on the scale and type of activity of a manufacturing company, a different technological approach is required to successfully complete a task.
But there are also common needs for all production entities associated with a change in base. These include:
dismantling of stationary equipment and machine tools;
partial disassembly of factory units into their constituent technological units;
packaging and labeling of transported industrial equipment;
rigging, loading equipment onto a vehicle;
transportation of production equipment to a new base;
unloading of machines at the place of arrival;
equipment installation and commissioning in the new territory.
What are the difficulties associated with the relocation of the plant?
Factory relocation at any level must be carefully planned in advance. This is a separate and very time-consuming process, which includes drawing up a logistics scheme and a detailed cost estimate. Planning ensures the ability to transport the plant at the optimal time and without material damage that can be caused by a number of unforeseen difficulties. For example, a common situation is a mismatch between the dimensions of the equipment and the doorways of the workshop. If the walls and partitions were erected at the enterprise after the installation of machine tools, conveyors, large stationary equipment, then in order to remove large-sized machines, it is often necessary to dismantle building structures, expand window or door openings.
Dismantling of industrial machines is a separate difficulty that requires specific knowledge. These works are carried out according to the established rules. So that when assembling the machine in a new place, individual elements of collapsible structures are not lost, it is necessary to correctly pack and label the units. An equally important stage is the loading and transportation of the company's property. Moving the plant requires large-scale transport, special equipment for lifting and installation on platforms, the labor of qualified riggers. The choice of the quantity and type of packaging materials is also a crucial moment. The packaging of industrial equipment, its placement in the body of a car requires compliance with certain technical regulations.
For example, high-precision electronic devices need maximum protection against vibrations that are inevitable during transport. To organize the relocation of the plant without wasting time, it is necessary to conduct a preliminary study of the new premises before transporting the equipment, to check the compliance of electrical equipment and other communications with the new conditions. This will allow avoiding forced downtime during the installation of machines after transportation.
Who to entrust the transportation operation?
It is convenient and profitable to carry out the factory relocation and the region by means of an experienced moving company. In this case, all the responsible stages will be taken over by qualified specialists who daily transport enterprises of the most varied specifics and know all the subtleties of the process. By entrusting the relocation of the plant to professionals, the head of the enterprise will be able not to be distracted by numerous organizational issues, but to fully deal with current tasks.
The contractors assume all financial risks associated with damage to the property of the enterprise during transportation or dismantling works, provide special equipment and materials, labor, and carry out preliminary planning. After the final installation, an act of completed work is drawn up, reflecting the compliance of the terms and quality of the move with the contractual conditions.