Hematite crusher manufacturer in Ethnic Congo
People do not care, perhaps sick; crusher actually like people, need maintenance.
New crushing machine in use should pay attention to the use and
maintenance of scientific approaches, here are twelve new crushing
machine routine maintenance guidelines:
Hematite crusher manufacturer in Ethnic Congo
1. The new crushing machine should load start, until smooth operation before feeding, feeding should be uniform when prohibiting overload operation, before stopping feeding should be stopped until all the material inside the device before shutdown after emptying.2. Enter the new crushing machine equipment materials shall comply with the technical requirements of the particle size should be controlled within a predetermined range, material moisture content of not more than 30%, feeding should be uniform, in order to improve the crushing machine crushing effect; non-metal material into the crusher, to prevent damage to the rotor member.
3. Be sure the new crushing machine spout unobstructed, should avoid the discharge port blockage caused by equipment overload; such as found in the particle size does not meet the specified requirements, should stop to check wearing parts and wear the belt tension.
4. A new crushing machine in normal operation, should be regularly to grease lubrication filling;
5. The new crushing machine is running, pay attention to the temperature rise of the bearing, such as temperature than normal should immediately stop check troubleshooting;
6. The new crushing machine during operation if abnormal vibration and noise, should immediately stop check excluded;
7. regularly check new crushing machine fasteners;
8. The new crushing machine counter board and liner, generally with high manganese steel production, worn by a high manganese steel electrode welding repair, severe wear can be replaced with new counter board and liner pull.
9. new crushing machine sieve and the rotor can be adjusted by adjusting the size of the spring pressure screw member, multi-purpose high-manganese steel sieve production, work is not only easy to wear, and when too much focus on material, or crushing cavity or into the iron parts fall off, plate bending deformation after the sieve bend can be hot repair method of alignment, worn sieve can also be surfacing repair;
10. If there is iron fall into the new crushing machine crushing cavity, crushing cavity or parts fall off, possibly resulting hammer seat crack. Hammer seat after cracks, repair should be prepared along the crack open welding repair groove, groove depth should not see until cracks, remove the groove on the net, with ordinary steel electrode welding repair, can also be used at both ends of the metal buckle legitimate booster repair.
11. New crushing rotor repair, regardless of the new board to replace the hammer assembly or repair after the old board hammer, the rotor should pay attention to the balance should be balancing check;
12. In the daily production process should always check the situation of each member of the new crushing machine, so to discover and remove, so as not to affect the normal production activities.
more:
- Gold ore crusher manufacturers in Congo
- Bornite-crusher-for-sale-in-Congo
- Chalcopyrite crusher for sale in Congo
Advertise on APSense
This advertising space is available.
Post Your Ad Here
Post Your Ad Here
Comments