Good quality & ultra-fine Specifications

Posted by Prestige Project
5
Sep 30, 2015
134 Views
Image

Mr. J.C. Sharma, Vice Chairman and Managing Director, Sobha Limited said, This latest segment of oar’s, the 'Sobha Dream Series' is efficiently planned and targeted at the young professional lookingPrestige ferns residency his/her first home. We are catering to the most demanding customer segment aspiring for premium homes. The venture is attractively priced as well as smartly planned with specialized technology, meticulous planning and strengthened by our backward integration capabilities - enabling us to come up with this massive venture  the biggest ever without sacrificing any of the values SOBHA stands for. The venture shall come up in 5 phases with 80 % open spaces.

 

The 'Sobha Precast' plant erected at the venture site is probably one of the largest and most modern set up catering to the large scale construction with unmatched class Prestige ferns residency Bangalore speed. Sobha Dream Acres' is situated in the midst of the four main arterial roads in the city the Outer Ring Road ORR, Marathahalli road, Varthur road and Sarjapur road aptly termed the 'Golden Quadrilateral'. It is situated at the best possible location, in the city's fast-developing locality of Balagere and is most sought after. The venture is not just ideally situated in close proximity to the city's IT corridors but as well as at a convenient distance from some of the good hospitals, schools, colleges, malls and recreation centres.

The Outer Ring Road ORR provides seamless connectivity between important commercial and residential destinations of Bangalore and is one of the most prominent catchment areas for the venture. The latest report from Colliers states that the existing working population in the ORR region itself is 2, 70,000 and the expected addition of working population by CY 2020 is about 210,000 and venture cumulative region absorption 2015 - 2020 is 35 million square feet The upcoming Peripheral Ring Road is expected to be ready in 3-4 years and is expected to further improve connectivity to the locality.

Comments
avatar
Please sign in to add comment.