Belgium 400 tph iron ore crushing production line
Device configuration: 1 feeder station, 1 jaw crusher, vibrating feeder 2, 2 hydraulic cone crusher, two circular vibrating screen, 2 Impact Sand, four circular vibrating screen, belt conveyor.
Sudan 400 tph limestone crushing production line
Construction Waste Recycling Plant
Process: stone blasting down from the mountains by dump truck will be less than 1020mm of stone into the vibrating feeder, vibrating feeder evenly into the stone jaw crusher, jaw crusher to be the first paragraph of broken stone by stone jaw crusher crushed in 150mm - 300mm or so, by vibrating feeder material into the hydraulic cone crusher for second paragraph broken, crushed material passes round vibrating sieve screening, more than 40mm material return to the cone crusher broken, 40mm or less material from the conveyor belt into the impact Sand shaping. After shaping the finished product after round vibrating sieve screening, transported by belt conveyor to the finished product area.
Crushing production line process: Silo ---- Feeder ---- ---- jaw crusher impact crusher vibrating screen ---- ---- can become a finished product. Intermediate between machines available phase conveyor.
Stone from the feeder evenly sent to jaw crusher preliminary crushing, and then produced into a coarse material transported by belt conveyor to the crusher for further crushing, crushing stone into the shaker after the screening of different specifications stones, gravel does not meet the size requirements of feed back into the crusher again.
Post Your Ad Here

Comments