T76 self-drilling hollow bar is an advanced
system that could support and reinforce the rock formation. It combines the
drilling, grouting, and anchoring into one step, which saves a lot of cost of
the whole construction.
In a subway construction, due to the
unstable formation and abundant groundwater, the traditional methods are not competent
to do this. Therefore, after comparison, we determine to support the foundation
with T76 sell-drilling hollow bar anchor system.
Under the action of the maximum horizontal
stress, the surrounding rock will appear interlayer dislocation, resulting in
the deformation of the foundation pit. The role of the T76 self-drilling hollow
bar system is to restrain the shear dislocation of the rock stratum along the
axial direction, so the main advantages of using the pile-anchor support type
in this open-cut foundation pit are as follows:
T76 self-drilling hollow bar has good
supporting effect, simple construction, and is conducive to mechanized
operation, and the construction speed is fast;
T76 self-drilling hollow bar has the
advantages of high strength, high rigidity and high shear resistance in force;
T76 self-drilling hollow bar support works
together with the surrounding rock to change the mechanical state of the
surrounding rock to achieve a more stable foundation pit wall.
T76 self-drilling hollow bar support
provides a large space for the construction of the internal structure of the
foundation pit, avoids the safety risks caused by the replacement of the
support, and effectively ensures the stability of the foundation pit during the
construction process.
The successful application of the T76
self-drilling hollow bar in the subway open-cut foundation pit provides a safe
and reliable space for the foundation pit excavation and structural
construction, and avoids the necessary switching support operation using inner
braces. Under the premise of effectively saving the project cost, the
construction risk is reduced and the project construction period is ensured.