Facts to Consider Before Building Custom Granny Flats in Adelaide

by William Jones manager

A granny flat is a great option for utilizing the extra space that can be used for a variety of purposes. But to construct a flat is no easy task and there are several steps to building it without facing hassles. The facts given here will help one to analyse if he can at all proceed with the construction.

Pre-requisites

There are several pre-requisites to building a granny flat and the custom home builders in Adelaide always ask these questions to their clients before proceeding to the next step.

The first and foremost point is the space required for the construction. The property must include a 12m width at the building line. For constructing the granny flat a distance of 3m has to be maintained from any existing trees that are over 6m in height. There should also be ample space as it is not impossible to work with smaller spaces and it is a costly affair.

Space Required

Space is an important requirement when it comes to building custom granny flats. The property has to be residential in the first place and should have a minimum of more than 400 metres square of the total area. In this type of area, the flat cannot exceed more than 60 metres per square to comply with all the rules.

Getting the Approvals

One of the most important points is to get the necessary approvals for building the flat.

Homeowners will need to approach the local authorities forgetting the certificate and to complete the paperwork necessary for the construction. An accredited certifier generally oversees the process of building custom granny flats in Adelaide. Once there is a green signal, designers and constructors can start their work.

Budget Allocation

Budget allocation is another important point to consider when it comes to constructing a flat in the designated area. A granny flat can become costly and it is best to talk to a financial adviser or with the bank officials who will guide through the process. However, it should be remembered that the cost of the flat will also depend on its size as well as the interior and exterior designs.

Duration

Generally, it takes around 12 to 14 weeks for the completion of a granny flat. Different constructors take different amounts of time. It also depends on the labour, the equipment, and the allocation of resources by the construction company.

Maintenance

The completion of the granny flat is just half the work done. The rest depends on maintenance. Since the place will be used by the senior members of the house or by the guests, routine hygiene checks and repairs are essential and this can be handled by professional building companies.

Taxes

For renting the flat there might be taxes applicable and it can vary from area to area and on the space used for the construction. Hence, it is necessary to check out the tax implications before beginning the construction of the granny flat.

There are many other points as well which can be described by the custom home builders in Adelaide. Therefore, it is best to take suggestions from these professionals who have the necessary knowledge regarding granny flats.


Sponsor Ads


About William Jones Advanced   manager

68 connections, 1 recommendations, 407 honor points.
Joined APSense since, May 8th, 2017, From Sydney, Australia.

Created on Sep 18th 2020 08:01. Viewed 296 times.

Comments

No comment, be the first to comment.
Please sign in before you comment.